Define the finished purpose, reference levels, underlying material condition and the evidence required by the receiving operation. Geometry alone does not establish structural or agronomic performance.

This reference assembles relevant extracts from the guide library. It is general project planning, not a local project report, verified specification or translated technical publication.

Landscape Surface Handover

A landscape-surface handover connects soil levels with the intended paths, planting and drainage. The growing layer and structural features need their own acceptance checks.

Before moving material

Confirm finished levels and the planting-medium requirements.

Receiving operation and checks

Hand over to the planting or hardscape team with remaining work identified. Inspect thresholds, tree zones and drainage transitions.

A visual landscape concept is not an issued construction design.

Read the complete Landscape Surface Handover guide

Why Water Returns After Grading

Water that returns to a repaired depression may indicate an unchanged outlet control, continuing inflow or settlement. Treat the recurrence as new evidence rather than simply repeat the same pass.

Before moving material

Compare the repaired levels with the drainage route and water observations.

Receiving operation and checks

Observe another suitable rainfall or irrigation event. Record where and when water reappears.

Subsurface and hydraulic causes may need specialist assessment.

Read the complete Why Water Returns After Grading guide

Driveway Grading

Driveway grading must tie vehicle access to existing thresholds and drainage. A change at the entrance can move water towards a building or create an abrupt vehicle transition.

Before moving material

Survey thresholds, boundaries, drains and buried services.

Receiving operation and checks

Compact or prepare for the selected final surfacing. Check vehicle transitions and the route taken by runoff.

Do not determine driveway drainage from appearance alone.

Read the complete Driveway Grading guide

Record the job inputs

Use this checklist to turn the scenario into a specific brief. Retain the design revision and agree who accepts each completed layer.

Checklist ticks apply only while this page is open. Include the completed brief in your project records.

Prepare a project enquiry

Continue through the network

Surface and verification · Applications and rental · Equipment and technology

Return to this reference group