Define the finished purpose, reference levels, underlying material condition and the evidence required by the receiving operation. Geometry alone does not establish structural or agronomic performance.

This reference assembles relevant extracts from the guide library. It is general project planning, not a local project report, verified specification or translated technical publication.

How to Prepare Subgrade for Road Base

Before road base is placed, the subgrade should be accepted for both level and condition. An uneven or weak supporting surface can lead to thickness variation and premature failure above it.

Before moving material

Confirm formation level and identify unaccepted areas.

Receiving operation and checks

Inspect and accept before spreading base aggregate. Record level and material checks for the same work area.

Adding more base material is not automatically a remedy for weak subgrade.

Read the complete How to Prepare Subgrade for Road Base guide

Council and Government Project Briefs

A government or council project brief should separate asset requirements from the choice of grading plant. Specify the surface outcome and acceptance evidence before inviting machinery-based solutions.

Before moving material

Identify the asset, stakeholders and required design inputs.

Receiving operation and checks

Review the proposed method against the brief and retain acceptance records. Check that design, grading, testing and handover responsibilities are assigned.

No government endorsement or supplier-panel membership is implied.

Read the complete Council and Government Project Briefs guide

Road-Base Preparation

Road-base preparation controls a specified aggregate layer, not ordinary topsoil. Even distribution and the right shape help the compaction and surfacing operations that follow.

Before moving material

Confirm aggregate type, accepted subgrade and planned layer thickness.

Receiving operation and checks

Compact and complete the project's layer-acceptance checks. Measure levels and thickness at representative locations and transitions.

Do not use a nominal scraper load count as evidence of compacted layer depth.

Read the complete Road-Base Preparation guide

Record the job inputs

Use this checklist to turn the scenario into a specific brief. Retain the design revision and agree who accepts each completed layer.

Checklist ticks apply only while this page is open. Include the completed brief in your project records.