Project reference 18212

Site Investigation — Handover To Next Trade

Define the finished purpose, reference levels, underlying material condition and the evidence required by the receiving operation. Geometry alone does not establish structural or agronomic performance.

This reference assembles relevant extracts from the guide library. It is general project planning, not a local project report, verified specification or translated technical publication.

Prepare for the Next Operation

Preparing for the next operation means identifying what the receiving team needs to start without rework. The handover may need access, layer condition, levels and records.

Before moving material

Ask the next operator or contractor for the required surface condition.

Receiving operation and checks

Hand over the checked area with outstanding items stated. Verify the agreed interface rather than only the grading team's own completion point.

Do not transfer unresolved defects silently to the next trade.

Read the complete Prepare for the Next Operation guide

Finished Surface Handover

A finished-surface handover records the surface that has been delivered and the evidence supporting it. It should identify what was checked and what lies outside the grading scope.

Before moving material

Agree the finished purpose and acceptance responsibilities.

Receiving operation and checks

Release the area to use or the next construction stage when accepted. Retain unresolved items and limits alongside the acceptance record.

The term finished should not imply certification beyond the checks actually performed.

Read the complete Finished Surface Handover guide

Survey Existing Ground

Surveying existing ground is the first project-stage record of the surface to be changed. Agree the coverage before the survey so critical features are not omitted.

Before moving material

Define boundaries of work, reference control and required detail.

Receiving operation and checks

Issue the survey with datum, units and limitations stated. Check control-point agreement and representation of abrupt terrain changes.

A survey deliverable should not be confused with a legal boundary determination.

Read the complete Survey Existing Ground guide

Record the job inputs

Use this checklist to turn the scenario into a specific brief. Retain the design revision and agree who accepts each completed layer.

Checklist ticks apply only while this page is open. Include the completed brief in your project records.

Prepare a project enquiry

Continue through the network

Surface and verification · Applications and rental · Equipment and technology

Return to this reference group