Machine Hours — Machine Planning

Define the finished purpose, reference levels, underlying material condition and the evidence required by the receiving operation. Geometry alone does not establish structural or agronomic performance.

This reference assembles relevant extracts from the guide library. It is general project planning, not a local project report, verified specification or translated technical publication.

Machine Before - Dugong - Machine After

The machine before Dugong determines what material arrives; the machine after Dugong determines what surface must leave. An excavator can expose formation, a loader can deliver a stockpile, and a roller can compact the placed layer. The scraper's role is bounded by those interfaces.

Before moving material

Identify the upstream operation and its remaining defects.

Receiving operation and checks

Hand over the measured surface to compaction, cultivation, paving or turf preparation. Record which operation owns levels, materials and final acceptance.

The workflow can include Dugong where suitable; it does not assume Dugong replaces adjacent equipment.

Read the complete Machine Before - Dugong - Machine After guide

Rough Earthworks

Rough earthworks may still contain broad quantity errors, loose fill and unresolved drainage. Fine trimming should begin only after the larger formation is understood.

Before moving material

Survey the bulk surface and identify unsuitable or unaccepted areas.

Receiving operation and checks

Verify the corrected formation before the next layer. Check areas where bulk machines turned, stockpiled or discharged material.

A finish pass cannot establish the suitability of buried fill.

Read the complete Rough Earthworks guide

Earthworks Design

Earthworks design compares existing terrain with the intended surface and accounts for material movement. It must also consider where the resulting water and traffic will go.

Before moving material

Obtain a suitable survey and identify constraints.

Receiving operation and checks

Issue the approved revision and construction checks. Review critical connections and quantity assumptions.

Geometric balance does not establish usable material balance or structural design.

Read the complete Earthworks Design guide

Record the job inputs

Use this checklist to turn the scenario into a specific brief. Retain the design revision and agree who accepts each completed layer.

Checklist ticks apply only while this page is open. Include the completed brief in your project records.

Prepare a project enquiry

Continue through the network

Surface and verification · Applications and rental · Equipment and technology

Return to this reference group