Project reference 16768

Offset — How To Plan Drainage

Define the finished purpose, reference levels, underlying material condition and the evidence required by the receiving operation. Geometry alone does not establish structural or agronomic performance.

This reference assembles relevant extracts from the guide library. It is general project planning, not a local project report, verified specification or translated technical publication.

Drainage Grade Design

Drainage grade design must connect the contributing area to a suitable outlet. Selecting a numerical fall before checking the outlet can produce a surface that cannot discharge as intended.

Before moving material

Survey entry points, structures and the receiving level.

Receiving operation and checks

Inspect the constructed route and its transitions. Check invert continuity and controls at crossings.

This guide does not size drains or establish discharge permissions.

Read the complete Drainage Grade Design guide

Poor Surface Drainage

Poor surface drainage can result from a blocked outlet, a reversed fall, a damaged crossing or local depressions. Grading should follow the identified cause.

Before moving material

Trace water from its entry point to the receiving outlet.

Receiving operation and checks

Inspect the drainage route during a suitable water event. Check that the complete route remains connected through boundaries and crossings.

Surface grading cannot remedy every subsurface drainage problem.

Read the complete Poor Surface Drainage guide

Surveying for Land Grading

Surveying for grading establishes the relationship between the site and the intended surface. Machine guidance can assist work, but the survey determines the reference against which results are checked.

Before moving material

Define the survey area, control and required deliverables.

Receiving operation and checks

Use the survey to prepare the design and later acceptance checks. Retain the datum, units and control-point descriptions.

A topographic survey and a legal boundary survey serve different purposes.

Read the complete Surveying for Land Grading guide

Record the job inputs

Use this checklist to turn the scenario into a specific brief. Retain the design revision and agree who accepts each completed layer.

Checklist ticks apply only while this page is open. Include the completed brief in your project records.

Prepare a project enquiry

Continue through the network

Surface and verification · Applications and rental · Equipment and technology

Return to this reference group