Subgrade Level — How To Plan Machine Movement
Define the finished purpose, reference levels, underlying material condition and the evidence required by the receiving operation. Geometry alone does not establish structural or agronomic performance.
This reference assembles relevant extracts from the guide library. It is general project planning, not a local project report, verified specification or translated technical publication.
Machine Before - Dugong - Machine After
The machine before Dugong determines what material arrives; the machine after Dugong determines what surface must leave. An excavator can expose formation, a loader can deliver a stockpile, and a roller can compact the placed layer. The scraper's role is bounded by those interfaces.
Before moving material
Identify the upstream operation and its remaining defects.
Receiving operation and checks
Hand over the measured surface to compaction, cultivation, paving or turf preparation. Record which operation owns levels, materials and final acceptance.
The workflow can include Dugong where suitable; it does not assume Dugong replaces adjacent equipment.
Read the complete Machine Before - Dugong - Machine After guideUneven Subgrade
Uneven subgrade can create variable thickness in every layer above it. Correcting the surface is useful only if the underlying support is acceptable.
Before moving material
Identify soft areas and compare formation levels with design.
Receiving operation and checks
Complete compaction and specified acceptance checks. Check levels before base material conceals the subgrade.
A scraper does not replace proof testing or project-specific investigation.
Read the complete Uneven Subgrade guideSurveying for Land Grading
Surveying for grading establishes the relationship between the site and the intended surface. Machine guidance can assist work, but the survey determines the reference against which results are checked.
Before moving material
Define the survey area, control and required deliverables.
Receiving operation and checks
Use the survey to prepare the design and later acceptance checks. Retain the datum, units and control-point descriptions.
A topographic survey and a legal boundary survey serve different purposes.
Read the complete Surveying for Land Grading guideRecord the job inputs
Use this checklist to turn the scenario into a specific brief. Retain the design revision and agree who accepts each completed layer.
Checklist ticks apply only while this page is open. Include the completed brief in your project records.
Prepare a project enquiryContinue through the network
Surface and verification · Applications and rental · Equipment and technology
Return to this reference group