Method Statement — How It Affects Grading
Define the finished purpose, reference levels, underlying material condition and the evidence required by the receiving operation. Geometry alone does not establish structural or agronomic performance.
This reference assembles relevant extracts from the guide library. It is general project planning, not a local project report, verified specification or translated technical publication.
Rough Earthworks
Rough earthworks may still contain broad quantity errors, loose fill and unresolved drainage. Fine trimming should begin only after the larger formation is understood.
Before moving material
Survey the bulk surface and identify unsuitable or unaccepted areas.
Receiving operation and checks
Verify the corrected formation before the next layer. Check areas where bulk machines turned, stockpiled or discharged material.
A finish pass cannot establish the suitability of buried fill.
Read the complete Rough Earthworks guideEarthworks Design
Earthworks design compares existing terrain with the intended surface and accounts for material movement. It must also consider where the resulting water and traffic will go.
Before moving material
Obtain a suitable survey and identify constraints.
Receiving operation and checks
Issue the approved revision and construction checks. Review critical connections and quantity assumptions.
Geometric balance does not establish usable material balance or structural design.
Read the complete Earthworks Design guideGolf Course Earthworks
Golf-course earthworks form designed contours and feature-specific surfaces. Smoothing away a deliberate mound or swale can defeat the course design.
Before moving material
Set out the intended feature and identify rootzone and drainage layers.
Receiving operation and checks
Complete the relevant drainage and turf preparation operations. Compare the finished shape with the feature design rather than a generic plane.
Greens, tees, fairways and paths need different acceptance criteria.
Read the complete Golf Course Earthworks guideRecord the job inputs
Use this checklist to turn the scenario into a specific brief. Retain the design revision and agree who accepts each completed layer.
Checklist ticks apply only while this page is open. Include the completed brief in your project records.
Prepare a project enquiryContinue through the network
Surface and verification · Applications and rental · Equipment and technology
Return to this reference group