Site Supervisor — Material Reuse
Define the finished purpose, reference levels, underlying material condition and the evidence required by the receiving operation. Geometry alone does not establish structural or agronomic performance.
This reference assembles relevant extracts from the guide library. It is general project planning, not a local project report, verified specification or translated technical publication.
Material Stockpiles
A stockpile is a temporary material store, not necessarily a ready-to-use grading supply. Segregation, contamination and mixed layers can develop while material is stored.
Before moving material
Identify the stockpile contents and approved use.
Receiving operation and checks
Grade the receiving area and remove temporary obstructions when appropriate. Check material condition and receiving quantities.
A compact scraper may be useful for placement but not for every stockpile loading task.
Read the complete Material Stockpiles guideFill Material Distribution
Fill distribution should preserve material identity and permit the required layer preparation. Random piles and inconsistent depth make later compaction and testing harder.
Before moving material
Confirm fill classification, receiving extent and layer requirements.
Receiving operation and checks
Compact and inspect before placing another layer. Measure receiving levels and record material source.
Geometric volume is not proof of suitable fill or completed compaction.
Read the complete Fill Material Distribution guideSurvey Existing Ground
Surveying existing ground is the first project-stage record of the surface to be changed. Agree the coverage before the survey so critical features are not omitted.
Before moving material
Define boundaries of work, reference control and required detail.
Receiving operation and checks
Issue the survey with datum, units and limitations stated. Check control-point agreement and representation of abrupt terrain changes.
A survey deliverable should not be confused with a legal boundary determination.
Read the complete Survey Existing Ground guideRecord the job inputs
Use this checklist to turn the scenario into a specific brief. Retain the design revision and agree who accepts each completed layer.
Checklist ticks apply only while this page is open. Include the completed brief in your project records.
Prepare a project enquiryContinue through the network
Surface and verification · Applications and rental · Equipment and technology
Return to this reference group