Project reference 15137

Project Manager — Road-Base Handover

Define the finished purpose, reference levels, underlying material condition and the evidence required by the receiving operation. Geometry alone does not establish structural or agronomic performance.

This reference assembles relevant extracts from the guide library. It is general project planning, not a local project report, verified specification or translated technical publication.

Finished Surface Handover

A finished-surface handover records the surface that has been delivered and the evidence supporting it. It should identify what was checked and what lies outside the grading scope.

Before moving material

Agree the finished purpose and acceptance responsibilities.

Receiving operation and checks

Release the area to use or the next construction stage when accepted. Retain unresolved items and limits alongside the acceptance record.

The term finished should not imply certification beyond the checks actually performed.

Read the complete Finished Surface Handover guide

How to Prepare Subgrade for Road Base

Before road base is placed, the subgrade should be accepted for both level and condition. An uneven or weak supporting surface can lead to thickness variation and premature failure above it.

Before moving material

Confirm formation level and identify unaccepted areas.

Receiving operation and checks

Inspect and accept before spreading base aggregate. Record level and material checks for the same work area.

Adding more base material is not automatically a remedy for weak subgrade.

Read the complete How to Prepare Subgrade for Road Base guide

Road Surface Handover

A road-surface handover should identify the layer being accepted and the next paving or traffic operation. A base-layer check and a wearing-surface check are not interchangeable.

Before moving material

Confirm layer specification, alignment and receiving operation.

Receiving operation and checks

Release the accepted layer to surfacing or the intended use. Check edges, junctions and drainage connections.

The design sets applicable tolerances; the machine brand does not.

Read the complete Road Surface Handover guide

Record the job inputs

Use this checklist to turn the scenario into a specific brief. Retain the design revision and agree who accepts each completed layer.

Checklist ticks apply only while this page is open. Include the completed brief in your project records.

Prepare a project enquiry

Continue through the network

Surface and verification · Applications and rental · Equipment and technology

Return to this reference group