Councils & Public Works
Council and public works briefs should state the asset outcome, scope boundaries and evidence needed for acceptance. Naming a machine too early can obscure whether the work requires design, bulk excavation or surface correction.
Before moving material
Identify the asset owner, procurement brief and work-zone controls.
Receiving operation and checks
Record the verified result and any work outside the contractor's scope. Check that the completed work answers the brief rather than a machine-based promise.
No council endorsement, supplier approval or procurement status is implied.
Read the complete Councils & Public Works guideWeight That Works
Working weight influences cutting, traction and ground loading, but weight alone does not establish grading performance. Ballast, a carried load and attachment weight also change the demands on the tractor, hitch and tyres. Consider the complete combination in both loaded and empty states.
Before moving material
Obtain the machine weights, hitch limits and tractor information.
Receiving operation and checks
Use a controlled trial to establish a workable pass depth. Observe slipping, rutting and unstable handling before chasing greater load.
More weight may damage soft ground and does not make a machine suitable for every tractor.
Read the complete Weight That Works guideBank, Loose and Compacted Volumes
Bank, loose and compacted volumes describe material in different states. A surveyed excavation volume, a carried scraper load and an accepted fill volume should not be compared as if they were identical.
Before moving material
Choose the volume basis for quantities and production estimates.
Receiving operation and checks
Reconcile placed quantities with survey and material records. Keep nominal capacity, load factor and compacted quantity separate.
No universal soil bulking or shrinkage factor is assumed.
Read the complete Bank, Loose and Compacted Volumes guideRecord the job inputs
Use this checklist to turn the scenario into a specific brief. Retain the design revision and agree who accepts each completed layer.
Checklist ticks apply only while this page is open. Include the completed brief in your project records.
Prepare a project enquiryContinue through the network
Surface and verification · Applications and rental · Equipment and technology
Return to this reference group