Project reference 06738

Incorrect Fall — Survey/Control Issue

Define the finished purpose, reference levels, underlying material condition and the evidence required by the receiving operation. Geometry alone does not establish structural or agronomic performance.

This reference assembles relevant extracts from the guide library. It is general project planning, not a local project report, verified specification or translated technical publication.

Incorrect Fall

Fall is the change in elevation along a defined direction. An incorrect fall can include a reversal, an insufficient gradient or a gradient that differs from the design.

Before moving material

Identify the start and end points, distance and elevation reference.

Receiving operation and checks

Measure the corrected profile independently. Check intermediate points because correct end levels can still hide a local dip.

There is no universal drainage fall appropriate to every project.

Read the complete Incorrect Fall guide

Incorrect Crossfall

Crossfall controls the change in level across a road, path or other surface. A correct centreline does not prove that the edges drain correctly.

Before moving material

Measure the cross-section at the affected location.

Receiving operation and checks

Check the corrected section and the neighbouring transition sections. Verify both edges and any gutter or drain connection.

Do not infer a road crossfall specification from a generic illustration.

Read the complete Incorrect Crossfall guide

Surveying for Land Grading

Surveying for grading establishes the relationship between the site and the intended surface. Machine guidance can assist work, but the survey determines the reference against which results are checked.

Before moving material

Define the survey area, control and required deliverables.

Receiving operation and checks

Use the survey to prepare the design and later acceptance checks. Retain the datum, units and control-point descriptions.

A topographic survey and a legal boundary survey serve different purposes.

Read the complete Surveying for Land Grading guide

Record the job inputs

Use this checklist to turn the scenario into a specific brief. Retain the design revision and agree who accepts each completed layer.

Checklist ticks apply only while this page is open. Include the completed brief in your project records.

Prepare a project enquiry

Continue through the network

Surface and verification · Applications and rental · Equipment and technology

Return to this reference group