Design Surface — Design To Machine
Define the finished purpose, reference levels, underlying material condition and the evidence required by the receiving operation. Geometry alone does not establish structural or agronomic performance.
This reference assembles relevant extracts from the guide library. It is general project planning, not a local project report, verified specification or translated technical publication.
Design to Dirt
A drawing becomes useful in the field when its levels, coordinates and version are understood by the people and equipment doing the work. A design may be correct while the machine follows the wrong datum or an outdated file. Resolve that transfer before soil moves.
Before moving material
Agree the coordinate system, vertical datum, benchmark and drawing revision.
Receiving operation and checks
Record changes and return the verified surface information to the designer. Retain the issued design and the as-built check as separate records.
Do not infer a surveyed boundary or certified design from an illustrative terrain model.
Read the complete Design to Dirt guideMachine Before - Dugong - Machine After
The machine before Dugong determines what material arrives; the machine after Dugong determines what surface must leave. An excavator can expose formation, a loader can deliver a stockpile, and a roller can compact the placed layer. The scraper's role is bounded by those interfaces.
Before moving material
Identify the upstream operation and its remaining defects.
Receiving operation and checks
Hand over the measured surface to compaction, cultivation, paving or turf preparation. Record which operation owns levels, materials and final acceptance.
The workflow can include Dugong where suitable; it does not assume Dugong replaces adjacent equipment.
Read the complete Machine Before - Dugong - Machine After guideDrainage Grade Design
Drainage grade design must connect the contributing area to a suitable outlet. Selecting a numerical fall before checking the outlet can produce a surface that cannot discharge as intended.
Before moving material
Survey entry points, structures and the receiving level.
Receiving operation and checks
Inspect the constructed route and its transitions. Check invert continuity and controls at crossings.
This guide does not size drains or establish discharge permissions.
Read the complete Drainage Grade Design guideRecord the job inputs
Use this checklist to turn the scenario into a specific brief. Retain the design revision and agree who accepts each completed layer.
Checklist ticks apply only while this page is open. Include the completed brief in your project records.
Prepare a project enquiryContinue through the network
Surface and verification · Applications and rental · Equipment and technology
Return to this reference group