Existing-Surface Survey
An existing-surface survey records what is present before soil moves. Omitting a drain edge, bank or abrupt grade change can distort the volume model even when point readings are correct.
Before moving material
Identify the work extent and important surface features.
Receiving operation and checks
Compare the surveyed surface with the proposed design. Inspect coverage and gaps rather than relying only on a coloured map.
Survey spacing must reflect terrain and required precision, not a universal grid size.
Read the complete Existing-Surface Survey guideSurvey Existing Ground
Surveying existing ground is the first project-stage record of the surface to be changed. Agree the coverage before the survey so critical features are not omitted.
Before moving material
Define boundaries of work, reference control and required detail.
Receiving operation and checks
Issue the survey with datum, units and limitations stated. Check control-point agreement and representation of abrupt terrain changes.
A survey deliverable should not be confused with a legal boundary determination.
Read the complete Survey Existing Ground guideTransport Lockouts and Machine State
Transport lockouts and parked-machine arrangements should follow the supplied machine instructions. A hydraulic control position should not be treated as an unspecified mechanical transport restraint.
Before moving material
Identify the actual locking and isolation arrangements.
Receiving operation and checks
Use the transport company's agreed loading and restraint process. Check that the machine is in its specified transport state.
This guide does not design a restraint system or replace the machine manual.
Read the complete Transport Lockouts and Machine State guideRecord the job inputs
Use this checklist to turn the scenario into a specific brief. Retain the design revision and agree who accepts each completed layer.
Checklist ticks apply only while this page is open. Include the completed brief in your project records.
Prepare a project enquiryContinue through the network
Surface and verification · Applications and rental · Equipment and technology
Return to this reference group