Project reference 05555

Gnss Grading — Machine Compatibility

Define the finished purpose, reference levels, underlying material condition and the evidence required by the receiving operation. Geometry alone does not establish structural or agronomic performance.

This reference assembles relevant extracts from the guide library. It is general project planning, not a local project report, verified specification or translated technical publication.

GNSS Machine Control

GNSS machine control combines positioning, machine geometry and design information. An accurate receiver position is not automatically an accurate cutting-edge position.

Before moving material

Confirm corrections, sensor arrangement and the coordinate reference.

Receiving operation and checks

Check the completed surface with an independent method. Inspect offsets, design revision and correction status when results disagree.

Compatibility must be confirmed for the actual machine and control installation.

Read the complete GNSS Machine Control guide

Transport Lockouts and Machine State

Transport lockouts and parked-machine arrangements should follow the supplied machine instructions. A hydraulic control position should not be treated as an unspecified mechanical transport restraint.

Before moving material

Identify the actual locking and isolation arrangements.

Receiving operation and checks

Use the transport company's agreed loading and restraint process. Check that the machine is in its specified transport state.

This guide does not design a restraint system or replace the machine manual.

Read the complete Transport Lockouts and Machine State guide

Machine Before - Dugong - Machine After

The machine before Dugong determines what material arrives; the machine after Dugong determines what surface must leave. An excavator can expose formation, a loader can deliver a stockpile, and a roller can compact the placed layer. The scraper's role is bounded by those interfaces.

Before moving material

Identify the upstream operation and its remaining defects.

Receiving operation and checks

Hand over the measured surface to compaction, cultivation, paving or turf preparation. Record which operation owns levels, materials and final acceptance.

The workflow can include Dugong where suitable; it does not assume Dugong replaces adjacent equipment.

Read the complete Machine Before - Dugong - Machine After guide

Record the job inputs

Use this checklist to turn the scenario into a specific brief. Retain the design revision and agree who accepts each completed layer.

Checklist ticks apply only while this page is open. Include the completed brief in your project records.