Gps Grading — Machine Compatibility
Define the finished purpose, reference levels, underlying material condition and the evidence required by the receiving operation. Geometry alone does not establish structural or agronomic performance.
This reference assembles relevant extracts from the guide library. It is general project planning, not a local project report, verified specification or translated technical publication.
Transport Lockouts and Machine State
Transport lockouts and parked-machine arrangements should follow the supplied machine instructions. A hydraulic control position should not be treated as an unspecified mechanical transport restraint.
Before moving material
Identify the actual locking and isolation arrangements.
Receiving operation and checks
Use the transport company's agreed loading and restraint process. Check that the machine is in its specified transport state.
This guide does not design a restraint system or replace the machine manual.
Read the complete Transport Lockouts and Machine State guideMachine Before - Dugong - Machine After
The machine before Dugong determines what material arrives; the machine after Dugong determines what surface must leave. An excavator can expose formation, a loader can deliver a stockpile, and a roller can compact the placed layer. The scraper's role is bounded by those interfaces.
Before moving material
Identify the upstream operation and its remaining defects.
Receiving operation and checks
Hand over the measured surface to compaction, cultivation, paving or turf preparation. Record which operation owns levels, materials and final acceptance.
The workflow can include Dugong where suitable; it does not assume Dugong replaces adjacent equipment.
Read the complete Machine Before - Dugong - Machine After guidePrecision Grade Control
Precision grade control is the stage where a reference system is commissioned for the intended surface. It needs design transfer and equipment checks before productive grading.
Before moving material
Confirm design revision, datum and the working-edge reference.
Receiving operation and checks
Verify surface results independently during and after the work. Record calibration and any reference interruptions.
Machine guidance is not acceptance certification.
Read the complete Precision Grade Control guideRecord the job inputs
Use this checklist to turn the scenario into a specific brief. Retain the design revision and agree who accepts each completed layer.
Checklist ticks apply only while this page is open. Include the completed brief in your project records.
Prepare a project enquiryContinue through the network
Surface and verification · Applications and rental · Equipment and technology
Return to this reference group