What machine should grade after a bulldozer — Public Works

Define the finished purpose, reference levels, underlying material condition and the evidence required by the receiving operation. Geometry alone does not establish structural or agronomic performance.

This reference assembles relevant extracts from the guide library. It is general project planning, not a local project report, verified specification or translated technical publication.

Machine Before - Dugong - Machine After

The machine before Dugong determines what material arrives; the machine after Dugong determines what surface must leave. An excavator can expose formation, a loader can deliver a stockpile, and a roller can compact the placed layer. The scraper's role is bounded by those interfaces.

Before moving material

Identify the upstream operation and its remaining defects.

Receiving operation and checks

Hand over the measured surface to compaction, cultivation, paving or turf preparation. Record which operation owns levels, materials and final acceptance.

The workflow can include Dugong where suitable; it does not assume Dugong replaces adjacent equipment.

Read the complete Machine Before - Dugong - Machine After guide

Councils & Public Works

Council and public works briefs should state the asset outcome, scope boundaries and evidence needed for acceptance. Naming a machine too early can obscure whether the work requires design, bulk excavation or surface correction.

Before moving material

Identify the asset owner, procurement brief and work-zone controls.

Receiving operation and checks

Record the verified result and any work outside the contractor's scope. Check that the completed work answers the brief rather than a machine-based promise.

No council endorsement, supplier approval or procurement status is implied.

Read the complete Councils & Public Works guide

Cut, Collect, Carry, Place & Grade

Cutting, collecting, carrying, placing and grading are different tasks. A machine that drags material forward does not necessarily carry a contained load to a distant low area. Break the earthworks into these actions so the route, implement and checking method match the actual work.

Before moving material

Survey high areas, receiving areas and obstacles before loading.

Receiving operation and checks

Recheck levels before another layer or another operation covers the work. Track the destination of material as well as the appearance of the cut.

Material suitability, safe towing and compaction requirements remain separate decisions.

Read the complete Cut, Collect, Carry, Place & Grade guide

Record the job inputs

Use this checklist to turn the scenario into a specific brief. Retain the design revision and agree who accepts each completed layer.

Checklist ticks apply only while this page is open. Include the completed brief in your project records.