Subgrade Grading and Compaction
Define the finished purpose, reference levels, underlying material condition and the evidence required by the receiving operation. Geometry alone does not establish structural or agronomic performance.
This reference assembles relevant extracts from the guide library. It is general project planning, not a local project report, verified specification or translated technical publication.
The Surface Is the Handover
The surface is the handover between operations. An excavator may finish its excavation, but the roller still needs suitable material, lift thickness and moisture. A scraper may finish shaping, but the irrigation operator still needs a connected fall to a usable outlet. Define acceptance at each transition instead of allowing the next machine to inherit an unresolved problem.
Before moving material
Name the operation that receives the surface and agree its requirements.
Receiving operation and checks
Release the area to the next operation only after outstanding defects are identified. Use independent level checks and project-specific material tests where required.
Visual smoothness alone does not prove compaction, bearing capacity or hydraulic performance.
Read the complete The Surface Is the Handover guideUneven Subgrade
Uneven subgrade can create variable thickness in every layer above it. Correcting the surface is useful only if the underlying support is acceptable.
Before moving material
Identify soft areas and compare formation levels with design.
Receiving operation and checks
Complete compaction and specified acceptance checks. Check levels before base material conceals the subgrade.
A scraper does not replace proof testing or project-specific investigation.
Read the complete Uneven Subgrade guidePrepare for Compaction
Preparation for compaction ensures that the compactor receives suitable material in the intended layer arrangement. Grading and moisture conditioning must fit the project requirements.
Before moving material
Confirm material, layer depth and compaction method.
Receiving operation and checks
Compact and test according to the brief. Inspect edges and areas inaccessible to the main compaction plant.
There is no single pass count or moisture target suitable for all materials.
Read the complete Prepare for Compaction guideRecord the job inputs
Use this checklist to turn the scenario into a specific brief. Retain the design revision and agree who accepts each completed layer.
Checklist ticks apply only while this page is open. Include the completed brief in your project records.
Prepare a project enquiryContinue through the network
Surface and verification · Applications and rental · Equipment and technology
Return to this reference group