Project reference 00171

Rough Formation

Define the finished purpose, reference levels, underlying material condition and the evidence required by the receiving operation. Geometry alone does not establish structural or agronomic performance.

This reference assembles relevant extracts from the guide library. It is general project planning, not a local project report, verified specification or translated technical publication.

Rough Formation

Rough formation establishes the broad geometry and material arrangement. It is the stage to correct major quantity errors rather than chase the final appearance.

Before moving material

Complete bulk movement and identify unaccepted areas.

Receiving operation and checks

Prepare for controlled movement and finishing. Check layer identity, drainage and access for the next machine.

Loose fill and weak formation should not be concealed by a finishing pass.

Read the complete Rough Formation guide

Drainage Formation

Drainage formation is the project stage that connects the planned water route through the earthworks. It should be coordinated with structures and crossings.

Before moving material

Set out the drainage profile and receiving outlet.

Receiving operation and checks

Complete erosion protection and inspect the connected route. Measure critical invert and transition levels.

A surface route does not establish drainage capacity or discharge permission.

Read the complete Drainage Formation guide

Survey Existing Ground

Surveying existing ground is the first project-stage record of the surface to be changed. Agree the coverage before the survey so critical features are not omitted.

Before moving material

Define boundaries of work, reference control and required detail.

Receiving operation and checks

Issue the survey with datum, units and limitations stated. Check control-point agreement and representation of abrupt terrain changes.

A survey deliverable should not be confused with a legal boundary determination.

Read the complete Survey Existing Ground guide

Record the job inputs

Use this checklist to turn the scenario into a specific brief. Retain the design revision and agree who accepts each completed layer.

Checklist ticks apply only while this page is open. Include the completed brief in your project records.

Prepare a project enquiry

Continue through the network

Surface and verification · Applications and rental · Equipment and technology

Return to this reference group