Define the finished purpose, reference levels, underlying material condition and the evidence required by the receiving operation. Geometry alone does not establish structural or agronomic performance.

This reference assembles relevant extracts from the guide library. It is general project planning, not a local project report, verified specification or translated technical publication.

Turf Underlay Preparation

Turf underlay needs a consistent growing layer over a correctly formed base. A smooth top surface can conceal an uneven distribution of suitable soil.

Before moving material

Check the formation and the growing-medium requirements.

Receiving operation and checks

Complete the venue's final soil preparation and turf installation. Check local low areas and underlay thickness.

Do not infer a turf rootzone specification from the word underlay.

Read the complete Turf Underlay Preparation guide

Crushed-Rock Preparation

Crushed-rock preparation concerns a specified material layer. Its grading, moisture and compaction requirements belong to the project brief, not merely the machine placing it.

Before moving material

Confirm material documents and supporting-layer acceptance.

Receiving operation and checks

Complete the specified testing and surface acceptance. Check material uniformity and layer depth.

A scraper's capacity cannot establish the compacted thickness achieved.

Read the complete Crushed-Rock Preparation guide

Turf Preparation

Turf preparation needs a finished growing surface with the planned drainage and usable soil condition. Correct the broad levels before trying to make a fine seedbed.

Before moving material

Confirm the underlying formation and growing-medium specification.

Receiving operation and checks

Finish the seedbed, irrigation installation and turf establishment. Check local depressions and changes in layer depth.

Grading does not determine whether the soil is agronomically suitable.

Read the complete Turf Preparation guide

Record the job inputs

Use this checklist to turn the scenario into a specific brief. Retain the design revision and agree who accepts each completed layer.

Checklist ticks apply only while this page is open. Include the completed brief in your project records.